Status. Proposed design only. Nothing in this vault is DG client approval. No application, service or test has been executed; every scenario is Not executed. Fees and dates are open.
Dependency and regression table
Every scenario keeps its stable ID and one primary step (an index). This table shows which assertions can be written or run early, and which later components must exist before the full scenario can be exercised. The last column states when a scenario becomes eligible for verification. Every scenario is currently Not executed and none is Passed.
| Scenario | Primary step | Can run early | Needs steps | Why | Status rule |
|---|---|---|---|---|---|
| T01 | 02 | Invitation claims, membership uniqueness, race outcome | 03 | Re-check the safe-denial shape and audit once the pipeline exists. | Eligible for full verification only after steps 03, 11; currently Not executed |
| T02 | 02 | Allow/deny matrix for team and assignment actions | 04, 06 | Publish (04) and formal-interest submit, accept and message (06) rows complete the matrix; cells depending on pending Q02 stay Pending decision. | Eligible for full verification only after steps 04, 06, 11; currently Not executed |
| T03 | 02 | Role/assignment scoping on identity fixtures | 06 | Admin visibility of A-B and A-C engagements needs private engagements, messages and actions. | Eligible for full verification only after steps 06, 11; currently Not executed |
| T04 | 02 | Assignment eligibility and cross-company rejection | 06, 07 | Moving a question and an action needs step 06 records; reassignment notification behaviour needs step 07 and Q07 (no new event type assumed). | Eligible for full verification only after steps 06, 07, 11; currently Not executed |
| T05 | 04 | Publication and version visibility | 05 | Discovery by search and filters completes it. | Eligible for full verification only after steps 05, 11; currently Not executed |
| T06 | 05 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 05, then rechecked in 11; currently Not executed |
| T07 | 05 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 05, then rechecked in 11; currently Not executed |
| T08 | 04 | Validation, no side effects, sanitised draft and preview render | 05 | Search and detail rendering after approval. | Eligible for full verification only after steps 05, 11; currently Not executed |
| T09 | 06 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 06, then rechecked in 11; currently Not executed |
| T10 | 06 | Separate engagements, lists, counts, errors | 07 | The notification and email canary scan needs the worker. | Eligible for full verification only after steps 07, 11; currently Not executed |
| T11 | 06 | Role, authority and input handling on messages | 07 | No private body in email or logs needs the worker. | Eligible for full verification only after steps 07, 11; currently Not executed |
| T12 | 06 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 06, then rechecked in 11; currently Not executed |
| T13 | 04 | Exact-version approval binding and self-approval | 06 | Formal interest submit bound to the approved version needs step 06. | Eligible for full verification only after steps 06, 11; currently Not executed |
| T14 | 04 | Stale-edit rejection for publication | 06 | A stale approved send of formal interest or accept needs step 06. | Eligible for full verification only after steps 06, 11; currently Not executed |
| T15 | 04 | Returned-work and stale-tab handling for drafts | 06 | Interest-side returned work needs step 06. | Eligible for full verification only after steps 06, 11; currently Not executed |
| T16 | 03 | Race harness and role-revocation mechanics | 04, 06 | Needs real publish/approve (04) and accept (06) commands to race. | Eligible for full verification only after steps 04, 06, 11; currently Not executed |
| T17 | 06 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 06, then rechecked in 11; currently Not executed |
| T18 | 06 | One active EOI under duplicate submit and retry | 07 | One logical event for the retry needs the worker side. | Eligible for full verification only after steps 07, 11; currently Not executed |
| T19 | 06 | Atomic accept/decline/withdraw transitions | 07 | One acceptance event and no duplicate logical delivery identity need the outbox contract (01) and worker (07). | Eligible for full verification only after steps 07, 11; currently Not executed |
| T20 | 06 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 06, then rechecked in 11; currently Not executed |
| T21 | 04 | V1 stays live while V2 is reviewed; pointer semantics | 05, 06, 07 | Recommendation refresh (05), EOI keeping V1 (06) and the safe change alert (07) complete it. | Eligible for full verification only after steps 05, 06, 07, 11; currently Not executed |
| T22 | 04 | Revision/response race harness; stale-view rule once Q06 is decided | 05, 06, 07 | Needs recommendations (05), EOI submission (06) and duplicate worker jobs (07). | Eligible for full verification only after steps 05, 06, 07, 11; currently Not executed |
| T23 | 06 | Pause/close against new interest | 07 | No closure email event is confirmed with the worker. | Eligible for full verification only after steps 07, 11; currently Not executed |
| T24 | 06 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 06, then rechecked in 11; currently Not executed |
| T25 | 03 | Session and saved-link invalidation on revocation | 06, 07 | Revoked access to engagement records needs 06; suppression of a queued email needs the worker (07). | Eligible for full verification only after steps 06, 07, 11; currently Not executed |
| T26 | 02 | Role downgrade and assignment removal on reads and writes | 07 | Recipient choice for queued mail needs the worker and Q07. | Eligible for full verification only after steps 07, 11; currently Not executed |
| T27 | 03 | Safe-denial harness on existing entities | 04, 05, 06 | Applies entity by entity as drafts, search results and conversations are built. | Eligible for full verification only after steps 04, 05, 06, 11; currently Not executed |
| T28 | 03 | Negative boundary on existing DG roles and routes | 06, 09 | Message bodies exist only after 06; the DG tool and metadata view (09) complete it. | Eligible for full verification only after steps 06, 09, 11; currently Not executed |
| T29 | 06 | Action creation and completion by participants | 08 | Cross-party visibility and daily-view effects are checked with 08. | Eligible for full verification only after steps 08, 11; currently Not executed |
| T30 | 08 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 08, then rechecked in 11; currently Not executed |
| T31 | 08 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 08, then rechecked in 11; currently Not executed |
| T32 | 06 | History retention through reassignment | 07 | Notification history for reassignment is checked with 07. | Eligible for full verification only after steps 07, 11; currently Not executed |
| T33 | 07 | Atomic state + outbox helper on a test mutation | 04, 06 | Verified for each real event-producing mutation as it is built; delivery in 07. | Eligible for full verification only after steps 04, 06, 11; currently Not executed |
| T34 | 07 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 07, then rechecked in 11; currently Not executed |
| T35 | 07 | Whole scenario | — | Self-contained in its primary step; rechecked in step 11 | Eligible for verification in step 07, then rechecked in 11; currently Not executed |
| T36 | 07 | Recovery and callback handling | 10 | The operations part needs the integrated build and runbooks. | Eligible for full verification only after steps 10, 11; currently Not executed |
| T37 | 01 | Configuration, secrets and session-handling harness checks | 02, 03, 09, 11 | Needs actual identity, role and revocation behaviour (02, 03), protected DG admin operations with MFA (09) and an integrated recheck (11). | Eligible for full verification only after steps 02, 03, 09, 11; currently Not executed |
| T38 | 01 | Environment configuration separation and credential-isolation checks | 07, 10 | Worker-failure visibility and staging email-sink isolation need the worker (07); the integrated operations review is at step 10. | Eligible for full verification only after steps 07, 10, 11; currently Not executed |
| T39 | 10 | Skeleton accessibility checks | 04, 05, 06, 08 | Core screens exist only after those steps; measured at step 10 on the integrated build. | Eligible for full verification only after steps 04, 05, 06, 08, 11; currently Not executed |
| T40 | 10 | Migration order and restore rehearsal plan | 11 | Release evidence is to be verified in step 11. | Eligible for full verification only after steps 11; currently Not executed |
| DG01 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG02 | 12 | Manual/document portion only; linked software portion not yet verified | 06, 11 | Manual evidence review and applicant receipt; separately verify the in-product label only once Q05/Q08 is decided. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG03 | 12 | Manual/document portion only; linked software portion not yet verified | 04, 05, 11 | Manual pointer and permission check; separately confirm the referenced published record and eligible audience. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG04 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG05 | 12 | Manual/document portion only; linked software portion not yet verified | 05, 11 | Manual neutrality disclosure/refusal; separately verify ranking has no undisclosed paid influence. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG06 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG07 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 06, 09, 11 | Manual requester-authorised assistance; separately verify DG cannot fetch private bodies through admin routes. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG08 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG09 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 06, 09, 11 | Manual session consent and agenda; separately verify the no-platform-body-access boundary. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG10 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG11 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG12 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG13 | 12 | Manual/document portion only; linked software portion not yet verified | 08, 11 | Manual stop-contact and requested help; separately verify company-only pending/overdue access. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG14 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG15 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG16 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG17 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG18 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG19 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG20 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 06, 09, 11 | Manual restricted incident-handling record; separately verify there is no ordinary DG private-thread fetch. This does not authorise a new incident-content feature. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG21 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 06, 07, 11 | Manual revalidation and handover of obligations; separately verify live product revocation. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG22 | 03 | Manual/document portion only; linked software portion not yet verified | 03, 04, 05, 06, 07, 09, 11 | Manual receipt-correlation review plus software metadata/route allow-deny and canary evidence. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG23 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG24 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 04, 06, 07, 08, 09, 11 | Document change/scope disposition; separately verify current access/output boundaries. No application implementation of the proposed extra features. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG25 | 02 | Manual/document portion only; linked software portion not yet verified | 01, 02, 03, 09, 11 | Manual invite-list/message review plus software claim, membership and session evidence. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG26 | 02 | Manual/document portion only; linked software portion not yet verified | 02, 03, 04, 05, 06, 11 | Manual intake-policy review plus actual own-intake state/operation API evidence under Q19. Linked baseline checks are not a substitute for the DG26 matrix. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG27 | 12 | Manual/document portion only; linked software portion not yet verified | 02, 03, 04, 06, 09, 11 | Manual assisted-onboarding advice and owner authority; separately verify denied impersonation/edit-as-owner routes in the existing product. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG28 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 06, 09, 11 | Manual checked-fact record/appeal; any in-product label/access assertion waits for Q05/Q08/Q20 and software evidence, not a verification engine. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG29 | 12 | Manual/document portion only; linked software portion not yet verified | 03, 04, 06, 09, 11 | Manual owner-supplied draft advice; separately verify exact-version publication and no DG draft/private-body access. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG30 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG31 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG32 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG33 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG34 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG35 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG36 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG37 | 12 | Manual/document portion only; linked software portion not yet verified | 04, 05, 06, 11 | Manual public-promotion disposition plus existing opportunity publication/approval evidence; no public CMS is introduced. See Mixed-Evidence-Disposition. | Manual evidence eligible after procedure approval; software evidence waits for linked components and integrated recheck; currently Not executed |
| DG38 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG39 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG40 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG41 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG42 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG43 | 12 | Manual rehearsal / review check | — | Not software; parallel track with its own pre-sale and pre-real-data gate; needs no application build | Eligible for staff rehearsal evidence after DG approves the procedure; currently Not executed |
| DG44 | 12 | Document/scope disposition and reference checks | — | No implementation of proposed new software; document checks remain separate from manual rehearsal and application behavior. | Eligible for document review; scenario remains Not executed |
Mixed evidence is split in Mixed-Evidence-Disposition; the primary-step home does not remove linked software dependencies.