Status. Proposed design only. Nothing in this vault is DG client approval. No application, service or test has been executed; every scenario is Not executed. Fees and dates are open.

AUDIENCE — INTERNAL working vault for Kedar and the delivery team. This is not a DG-ready distribution and no part of it is claimed client-safe or redacted. It contains internal effort estimates, historical negotiation notes, source code, duplicate attachments and verbatim agent exchanges. A future DG-facing export would need a separate, reviewed selection with repaired links; deleting a few named notes would not be enough.

DG Partnership Exchange — consolidated vault

One Obsidian vault for the proposed Balanced DG Partnership Exchange: architecture, journeys, permissions, DG paid services, step-by-step programming specifications, all 84 scenarios, decisions Q01–Q25, the commercial and schedule options, every actual agent exchange and review record, and the original source documents.

Consolidation review complete

Builder and reviewer records are included. The reviewer verified the final corrections and accepted this INTERNAL reference-vault handoff, not DG policies or an application. See Final-Consolidation-Verdict and Vault-Review-Record.

Supplemental restored-agent review and corrections are in Restored-Reviewer-Feedback and Restored-Review-Correction-Record. Current traceability separates Mixed-Evidence-Disposition and the proposed A11-Language-and-Email-Checklist.

How to use it

  1. Extract the whole ZIP and open the folder as a vault. Links are local; no plugin is needed.
  2. Read Status-and-Honesty and Scope-Balanced-Manual-Additional first.
  3. Build order is in Implementation-Order-Overview. Each step lists the scenarios to write first (TDD), the decisions that block it and its exit gate.
  4. Every scenario is a note (Scenario-Index); every pending decision is a note (Decision-Index). IDs never change.
  5. Evidence of how this vault was built and checked: Vault-Review-Record, Reviewer-Change-Record, Builder-Response-R01-R08, Validation-Results, Source-Inventory, Tooling-README.

Map

FolderContents
01-OverviewStatus, scope separation, document lineage, reviewer change, glossary
02-ArchitectureComponents, data, permissions, state, notifications, API pipeline, deployment, targets
03-JourneysMember journey, daily tracking, DG service journey
04-DG-ServicesService gates S01–S13, charter, neutrality, consent, public promotion
05-Implementation-OrderTwelve ordered programming steps
06-ScenariosT01–T40, DG01–DG44 and traceability
07-DecisionsD01–D10 (proposal) and Q01–Q25 (pending)
08-Commercial-and-ScheduleOptions, provisional schedule, internal effort note
09-Exchanges-and-ReviewsActual exchanges, supersession, review records
10-SourcesOriginal documents with checksums
11-ToolingValidator and builder scripts (see Tooling-README)
99-ValidationAutomated structural checks

Counts

84 scenarios (T01–T40, DG01–DG44), 25 pending decisions (Q01–Q25), 10 proposal decisions (D01–D10), 11 acceptance gates (A01–A11), 13 service gates (S01–S13), 12 implementation steps. All scenarios: Not executed.