Status. Proposed design only. Nothing in this vault is DG client approval. No application, service or test has been executed; every scenario is Not executed. Fees and dates are open.

DG42 · Withdrawal is specific and receipts follow removal

FieldValue
StatusNot executed
TypeManual DG service
Layer / kindManual · ordering rehearsal
Priority—
GatesS13
Build stepStep-12-Manual-DG-Services-and-Scope-Guards
DecisionsQ14, Q24, Q18

Given

Consent variants: newsletter, promotion, badge evidence, recording, introduction and membership. Some content is unsent, controlled-posted, delivered or reposted.

When

Receive scoped withdrawal before/after send; hold affected work and track controlled takedown/third-party request.

Then / oracle

Apply relevant hold and confirm scope; do not silently cancel unrelated consents. Before send block it; after send stop future use, request/perform controlled removal as agreed and state actual status. No Removed claim before evidence or erasure claim about email/caches/screenshots/reposts.

Evidence required

Consent/action ordering, hold, requested/in-progress/confirmed removal trail and residual-limit receipt.

Decision dependency (verbatim)

Q14/Q24/Q18: authority, withdrawal/removal owner/windows and incident handling; values pending.

Source: TDD rev 1.3 (PDF); machine-readable in 10-Sources/tdd-bundle/. Back to Scenario-Index · Traceability-Matrix · integration dependencies in Dependency-and-Regression-Table.