Status. Proposed design only. Nothing in this vault is DG client approval. No application, service or test has been executed; every scenario is Not executed. Fees and dates are open.
Development layer log
Append-only. Newest last.
| Date | Entry |
|---|---|
| 2026-10-20 | Layer created with the AI operating notes (operating-contract, task-receipt). |
| 2026-10-20 | Phase 2 notes added: standards, architecture, modules, testing, operations and ADR-0001 to ADR-0005 (all Proposed). Scenario tables generated from the 84 scenario notes. |
| 2026-10-20 | Phase 5 dry run: Planning/ISSUE-PLAN.json and ISSUE-PLAN.md (54 issues) generated from the vault; nothing filed on GitHub. |
| 2026-10-21 | R6 staged: Planning/R6-staging/ (41 notes) banners 04-DG-Services, 09-Exchanges-and-Reviews and 10-Sources with GGA dispositions; originals unchanged until the owner-override move. |
| 2026-10-21 | R7: scripts/vault_baseline_validate.py and tests added; note Baseline-Validator. Legacy validator and 99-Validation untouched (evidence folders). |
| 2026-10-21 | R8a: Planning/GGA-ISSUE-PLAN.json and .md (39 issues, dry run). Supersedes ISSUE-PLAN.*. Nothing filed. |
| 2026-10-21 | Vault site deployment prepared: deploy/vault/ (Quartz build, nginx container, host nginx conf, README) and .github/workflows/deploy-vault.yml. Not applied to the server; internal vault stays behind Cloudflare Access. |