Status. Proposed design only. Nothing in this vault is GGA client approval. The GGA client documents are supplied drafts: see GGA-Source-Digest. No application, service or test has been executed; every scenario is Not executed. Delivery fees and dates are open.

GS06 · Freshness boundary and recovery

FieldValue
StatusNot executed
TypeBalanced software (new in the GGA baseline)
SourceBlueprint pp. 7, 16 (GGA-Requirement-Register); client-supplied draft, not accepted
GateGA03
Blueprint delivery stageStage 2 Foundation and publishing (p. 19)
Build step02 (primary; tests first)
Replaces or carriesDG13, T31
DecisionsGL03-staged

Given

A company confirms its profile at a controlled clock time. Reminder jobs exist for the due date and the grace points. The scheduled job is disabled in one run.

When

Advance the clock to the due date and the configured reminder and grace-end points (proposed defaults: grace days 7 and 13, grace end at due plus 14 days). Then submit a valid no-change attestation. Repeat with an independent review hold in place.

Then / oracle

Reminders are sent once per company, attestation cycle and reminder type. At the configured end of the grace period (due plus 14 days under the proposed defaults) new detailed access pauses even though the job did not run. A valid attestation, including a no-change confirmation, restores access immediately and resets the clock, unless an independent hold remains. A fresh confirmation stops old-cycle jobs.

Evidence required

Clock-controlled run with the job disabled; reminder records keyed by cycle; access result at each boundary.

Decision dependency

  • GL03-staged: Blocked by GL03: the 30-day, 14-day grace and reminder-day values are proposed defaults to be made configurable and recorded by GGA operations; the oracle is parameterised by the recorded values, not fixed numbers

Where a decision is pending, the dependent assertion is Blocked by that decision and no oracle is invented. A proposed default is a configuration value, not a promise. This note is a specification: it is Passed only on a named integrated build and fixture.

Back to GGA-Scenario-Index · GGA-Traceability-Matrix · Scenario-Dispositions.