Status. Proposed design only. Nothing in this vault is DG client approval. No application, service or test has been executed; every scenario is Not executed. Fees and dates are open.

Document lineage

OrderDocumentStatusLocal copy
1DG FutureTech Partnership Exchange Approval proposal v3 (19 Oct 2026)Original; wider Release 1 scope; price/dates openPDF
2Delivery options comparison rev 5DG-facing; fees open; schedule openHTML · Delivery-Options-Comparison
3Internal technical reviewsInternal effort basisInternal-Effort-Estimates
4Balanced architecture rev 3 (13 pp)ProposedPDF · HTML
5Provisional schedule addendumProvisional, non-bindingPDF · Provisional-Schedule
6TDD rev 1.0 → 1.3 (80 pp, 84 scenarios)Proposed, nothing executedPDF · HTML
7This vault rev 1.3Consolidation; no new policy00-Start-Here

Later corrections supersede earlier withdrawn agent statements, never a signed DG decision (none exists). If a later requirement conflicts, add a versioned decision record rather than editing history.

Vault history: rev 1.0 initial consolidation; rev 1.1 R01–R08 responses; rev 1.2 F01–F04 and reviewer handoff; rev 1.3 restored-reviewer traceability corrections. The source TDD remains revision 1.3 independently of this vault revision. See Restored-Reviewer-Feedback.