Status. Proposed design only. Nothing in this vault is DG client approval. No application, service or test has been executed; every scenario is Not executed. Fees and dates are open.

Definition of ready and done

Ready

  • Overall start conditions are met (see Implementation-Order-Overview preconditions). Until the owner confirms them, only documentation and policy-independent planning proceed.
  • The tests-first subset from the step note is named.
  • Each Qnn the behaviour needs is resolved by DG, or the scenario is scoped Pending decision and the task excludes it. A proposed default is a recommendation, never a prerequisite.
  • Prerequisite steps exist on main.

Done

Use these words literally:

  • Implemented; awaiting owner review: PR open, focused checks run, review state recorded (independent review done, or draft marked “review pending”).
  • Merged: the owner merged it. Merged is not deployed.
  • A scenario is Passed only on a named integrated build and fixture (Scenario-Evidence-Rules).

Never write “complete”, “shipped” or “approved” for software on the strength of a merge, a green unit test, or two agents agreeing. DG approval and launch approval are separate, written, and DG’s alone.

Change history

DateChange
2026-10-20Created (bootstrap Phase 2)