Status. Proposed design only. Nothing in this vault is GGA client approval. The GGA client documents are supplied drafts: see GGA-Source-Digest. No application, service or test has been executed; every scenario is Not executed. Delivery fees and dates are open.
Q05 · EOI required fields and state machine
| Field | Value |
|---|---|
| Status | Pending GGA decision (recorded in 1.3 as “Pending DG decision”) |
| 1.3 to GGA disposition | Reframed |
| Responsible role to confirm (recommendation) | GGA domain/product reviewer |
| Needed before | Before T17–T20 |
| Named owner | [ ] |
| Due date | [ ] |
| GGA approver / decision date / chosen rule | [ ] |
What the GGA documents say
A pitch needs a concise fit statement, a proposed next step and the exact profile fields the applicant permits the owner to see; one open interest per company and opportunity; the owner accepts or declines; consent request valid 14 days (proposed default); withdrawal before release releases nothing (pp. 6, 15).
Source class: client-supplied design proposal or proposed default unless stated; GGA acceptance is not recorded. See GGA-Requirement-Register.
Rule or question as proposed in 1.3 (kept as history)
Contribution, benefit/return, responsible contact and version; define meaningful conditions, active states, terminal decline/resubmission and races. Confirm verification evidence validity and stale label.
Still open
Verification-evidence validity and the stale label, resubmission after decline, and whether a pitch needs a minimum quality bar remain open.
Scenarios that depend on this decision (1.3 IDs, unchanged)
T17, T18, T19, T20, T24, DG02, DG28. Their dispositions are set in work package R4.
Related
GL04-staged, GL06-staged. Index: Decision-Index.
A suggested default is a recommendation, not an approval. Record any actual decision with: ID · chosen rule · amendment to architecture and acceptance · GGA approver · decision date · affected test IDs · implementation owner.